Maintenance requirements:

  1、在维修过程中,需要对成型液压机的可操纵部分进行调整、调试、整定和检查,需要机械、液压和电气领域的合格技术人员相互配合,共同完成作业;

  2、四柱液压机的电气系统维护必须由合格的电气技术人员进行,非专业人员不得擅自修理;

Without the consent of the professional and technical personnel of the hydraulic press manufacturer, the internal circuit and hydraulic system pipeline of the electrical system of the forming hydraulic press shall not be replaced without authorization, the hydraulic components shall not be replaced, the parts that do not meet the specifications shall not be replaced, and the structure of the hydraulic press shall not be replaced.

四柱液压机有哪些维修要求和注意事项?

Note:

Repair the forming hydraulic press in a clean and clean purification workshop, remove the liquid pressure in the hydraulic press, and discharge the hydraulic oil without abnormal conditions; When disassembling the hydraulic press oil pipe, place the oil pipe near the cleaning part first. When cleaning, use clean plastic products or paraffin paper to wrap the tubing in the tubing opening position of the four-column hydraulic press. Never plug the tubing string with cotton yarn or rags. Be careful to prevent impurities from mixing in. When repairing more complex pipelines, the numbered white iron sheet or plastic sheet should be tied to the connection of each pipeline. The installation is convenient and there will be no wrong pipelines. Various hydraulic machine components and their parts should be properly stored and placed. No failure.

The hydraulic components and pipe fittings of the four-column hydraulic press should not be tightened too tightly to avoid oil leakage due to deformation of the shell or valve core. When replacing the rubber sealing ring of the hydraulic press, do not use sharp tools, but also be careful not to touch the working surface. O-rings or other seals should be immersed in oil before the device is delivered. After installing the four-column hydraulic press, the sealing ring must not be deformed to ensure the smooth progress of the sliding process. When repairing the hydraulic press, the sharp corners of the parts in contact with the O-ring or other seals should be passivated to prevent the sealing ring from being scratched by sharp corners or burrs.

The four-column hydraulic press has a lot of processing appearance, and does not touch the processing appearance. Use appropriate tools to prevent damage to the hexagonal part of the bolt. After installation, various parts must be cleaned.


GEO-CANARY-86EA1707