1. Before testing the machine, scrub the exposed hydraulic components and pipelines again, and use sponge to disable cotton yarn.
2. Add enough lubricating oil for guide rail, oil filler and other sliding pairs as required.
3. Check whether the rotary direction of the oil pump, the oil cylinder, the oil motor and the inlet and outlet oil pipes of the oil pump are connected incorrectly.
液压机:600吨液压机在调试前要做哪些检查?
4, check the hydraulic components, pipelines and other connections are correct and reliable, the installation of the wrong to be corrected.
5、检查各手柄位置,确认;停止;后退;及卸荷;等位置,各行程挡块紧固在合适位置。
6. Loosen the handle of the overflow valve and tighten the handle of the safety valve appropriately to adjust the overflow valve to a low working pressure. The flow valve is adjusted to small.
7. close the power supply.

GEO-CANARY-86EA1707